快上网专注成都网站设计 成都网站制作 成都网站建设
成都网站建设公司服务热线:028-86922220

网站建设知识

十年网站开发经验 + 多家企业客户 + 靠谱的建站团队

量身定制 + 运营维护+专业推广+无忧售后,网站问题一站解决

OracleProjects-APIntegrationPart2

转自:http://www.linkedin.com/pulse/20140701051523-19818376-oracle-projects-ap-integration-part2
  • Quantity – Based on the Expenditure Type definition, quantity is verified by checking the PA_QUANTITY column in the AP_INVOICE_DISTRIBUTIONS_ALL. If the COST_RATE_FLAG column in PA_EXPENDITURE_TYPES table is set to Y, then the quantity field in the Payables Invoice Workbench needs to be filled in.

Once all the requisite information has been entered and the invoice distribution saved, the system checks whether the values given in the Project, Task, Expenditure Type and Expenditure Organization fields are active as of the Expenditure Item Date.

成都创新互联公司主营白云网站建设的网络公司,主营网站建设方案,成都app软件开发公司,白云h5微信小程序搭建,白云网站营销推广欢迎白云等地区企业咨询

The following columns in the AP_INVOICE_DISTRIBUTIONS_ALL table are relevant for project-related supplier invoices:

  1. PROJECT_ACCOUNTING_CONTEXT – This column is set to Yes if the Project ID column is filled.
  2. ASSET_ADDITION_FLAG – If the project-related invoice distribution is charged to a Capital Project, then the ASSET_ADDITION_FLAG is set to P when the PA_ADDITION_FLAG is set to Y, Z or T.

To avoid the same invoice distribution being interfaced to both Projects and Fixed Assets, you must interface any project-related invoice distribution to Oracle Projects before you interface it to Oracle Assets.

  1. PA_ADDITION_FLAG- The PA_ADDITION_FLAG tracks the status of project-related supplier invoice distribution lines and expense report distribution lines. For supplier invoice distributions entered via Oracle Payables, the PA_ADDITION_FLAG is set to N if the distribution is project-related, otherwise it is set to E and it is updated by Oracle Projects when the distribution is processed by the Oracle Projects Interface Supplier Invoice process. Oracle Projects sets the PA_ADDITION_FLAG to Y or Z after the item is successfully processed, or may be set to a rejection code if the line is rejected during transfer to Projects. For supplier invoice adjustment lines interfaced from Projects to Payables (which must net to zero with another line), the value for the PA_ADDITION_FLAG is set to T. Listed below are the Quick Codes available for the PA_ADDITION_FLAG:

PA_ADDITION_FLAG

DESCRIPTION

B

No open PA period

C

Task does not allow charges

D

Outside project dates

E

Non-project related invoice distributions

I

Outside task dates

J

Project level transaction controls violated

K

Task level transaction controls violated

M

Invalid project/task combination

N

New line not yet processed by Oracle Projects

P

Project is closed

Q

Transaction control extension violated

S

Temporary status used during processing

T

Adjustment line transferred from Oracle Projects

V

Invalid data (catch-all error)

X

Burdening error

Y

Transferred to Oracle Projects

Z

Net zero adjustment line. Never transferred to PA

  1. If an item is rejected, you must correct the rejection reason and re-run the interface process.
  2. Once the Invoice is interfaced to Projects, the following tables are populated with appropriate values:
  • PA_EXPENDITURE_GROUPS_ALL
  • PA_EXPEDITURES_ALL
  • PA_EXPENDITURE_ITEMS_ALL
  • PA_COST_DISTRIBUTION_LINES_ALL

网站栏目:OracleProjects-APIntegrationPart2
文章来源:http://6mz.cn/article/jogeop.html

其他资讯