快上网专注成都网站设计 成都网站制作 成都网站建设
成都网站建设公司服务热线:028-86922220

网站建设知识

十年网站开发经验 + 多家企业客户 + 靠谱的建站团队

量身定制 + 运营维护+专业推广+无忧售后,网站问题一站解决

IncorrectCostforWIPAssemblyReturn1-创新互联

Incorrect Cost for WIP Assembly Return 1

Incorrect Costs For Wip Assembly Return To Discrete Job Using Average Costing (文档 ID 788680.1) Incorrect Cost for WIP Assembly Return 1

In this Document

创新互联建站成立于2013年,是专业互联网技术服务公司,拥有项目成都网站制作、成都网站建设网站策划,项目实施与项目整合能力。我们以让每一个梦想脱颖而出为使命,1280元顺德做网站,已为上家服务,为顺德各地企业和个人服务,联系电话:18982081108

Symptoms

Changes

Cause

Solution

References

Applies to:

Oracle Cost Management - Version 11.5.10.2 to 12.1.3 [Release 11.5 to 12.1]
Information in this document applies to any platform.

Symptoms

Find using the average cost method and our orgs are Project Manufacturing enabled. WIP Assembly returns to a job are supposed to be costs at the average unit value for completions from that job.
Material was issued to the job in the AUG-08 period at $2,774.81 and the job was fully completed (8 ea) at the same total cost in the same period.
In the following period (SEP-08), OSP resource costs of $1800 were received to the job. In an attempt to absorb this additional cost, all 8 were returned using the WIP Assembly return
transaction then all 8 were completed again using WIP Assy Completion transaction. Oracle costed the WIP assembly return at $0 cost.
This is incorrect. It should have returned 8 at $2,774.81 for a unit cost of $346.85. Then, the 2nd WIP assembly completion was costed at $4,574.81 ($2,774.81 + $1800) Essentially, the $2,774.81 material cost on the job was absorbed to inventory twice
EXPECTED BEHAVIOR
Expect ...8 returned at $2,774.81 for a unit cost of $346.85
-- Steps To Reproduce:
The issue can be reproduced at will with the following steps:
1. Open a standard discrete job in a manufacturing org using average cost method.
The routing should have an OSP resource requirement. the BOM should have one costed material component.
2. Issue material to the job and fully complete the job in one accounting period.
3. Close the accounting period
4. Receive OSP resource costs in the next period.
5. Do a WIP assembly return of all quantity completed. Then, do another final WIP assy completion

Changes

 

Cause

Code Issue
The material costs incurred against some operations (new operations) were not being relieved through the completion transactions

Solution

EBS 11.5.10.X

-- To implement the solution, please execute the following steps:

1. Download and review the readme and pre-requisites for Patch 7520866

bom  patch/115/sql  CSTLCACB.pls  115.6.115100.6 
bom  patch/115/sql  CSTLCASB.pls  115.3.115100.4 
bom  patch/115/sql  CSTPACCB.pls  115.17.115100.12 
bom  patch/115/sql  CSTPACSB.pls  115.8.115100.8

You can use the commands like the following:
strings -a $BOM_TOP/filename |grep '$Header'
5. Retest the issue.
6. Migrate the solution as appropriate to other environments.
---------------------------------------------------------------------
EBS 12.1.X

To implement the solution, please execute the following steps:

1) Please download and review the readme for Patch 11805897:R12.BOM.C

2) Please apply Patch 11805897:R12.BOM.C in a test environment.

3) Please confirm the following file versions:
CSTPACCB.pls 120.8.12010000.8
CSTPACSB.pls 120.2.12010000.4
CSTLCACB.pls 120.2.12010000.4
CSTLCASB.pls 120.1.12010000.3

4) Please retest the issue.

5) If the issue is resolved, please migrate the solution as appropriate to other environments.



本文标题:IncorrectCostforWIPAssemblyReturn1-创新互联
网页网址:http://6mz.cn/article/hcggd.html

其他资讯